• +90 262 644 45 38    info@birlikhidrolik.com.tr

QUALITY CONTROL

QUALITY CONTROL

With the Quality Control Plan defined in our system, production processes are controlled and product quality is ensured. The quality control plan is kept up-to-date by closely following all developments and demands.

First Quality Control To be used to carry out the production, material , all cutting tools are special cartridge valve assemblies, manuals and all equipments are checked before they are included in the production. These tools are approved for production and periodically checked to ensure continuity.

Production Quality Control
During the production stages, all operators control the previous operation and the operation performed by them within the framework of a systematically defined Control Plan. Thanks to this, it is ensured that precautions are taken without carrying the error. All computer software and measuring instruments required for control are verified for accuracy. Developments are kept up-to-date by continuous improvement by following them. All machining products are deburring, cleaned and washed and transferred to the Final

Quality Control department.
Final Quality Control It is 100% checked that all requirements of customer demands in specification and construction drawing are met. All measuring instruments required for inspection are kept approved and up to date. As a result of the control, an approved Quality Control Report is prepared and shipped for the products that meet all the demands.